Key takeaways
- Time quotes by touch, not by feel: sorting, first reply, clarifying rounds, the call, the kitchen check, writing, revisions and follow-ups.
- Price the minutes at a loaded rate. Benefits are 30.0% of private-industry compensation costs[1], so a $33.36 manager wage[2] costs about $48 an hour.
- Divide by your quote-to-order rate, because the quotes you lose are paid for by the orders you win.
- Small drop-off quotes carry the highest admin cost as a share of the order, so they gain the most from fixed menus and posted prices.
- Capturing the five intake facts at first contact removes most clarifying rounds, the biggest avoidable block of time.
Quote time hides in the gaps
Nobody puts “catering quotes” on the schedule, so the time disappears into the gaps: ten minutes between lunch and the pre-shift meeting, a call returned from the car, a menu revision typed at 11 pm. The quote that took “a few minutes” often took an hour and a half, spread across four days and three people.
That time is real labor, usually a manager's, and it is spent on every inquiry, including the ones that never book. Food service managers already carry long weeks: their schedules can include nights, weekends and holidays, and some work more than 40 hours a week[2]. There are fewer hands to share it with, too. Seasonally adjusted employment at caterers, food service contractors and mobile food operators fell from about 798,800 in January 2025 to about 728,000 in September 2026[3].
Source: US Bureau of Labor Statistics, 2026[3]
Show the data
| Month | Employees (thousands) |
|---|---|
| Jan 2025 | 798.8 thousand |
| Feb 2025 | 797.9 thousand |
| Mar 2025 | 795.6 thousand |
| Apr 2025 | 794.3 thousand |
| May 2025 | 789.7 thousand |
| Jun 2025 | 778.6 thousand |
| Jul 2025 | 778 thousand |
| Aug 2025 | 780 thousand |
| Sep 2025 | 780.2 thousand |
| Oct 2025 | 777 thousand |
| Nov 2025 | 773.3 thousand |
| Dec 2025 | 775.9 thousand |
| Jan 2026 | 762.5 thousand |
| Feb 2026 | 765 thousand |
| Mar 2026 | 759 thousand |
| Apr 2026 | 759.6 thousand |
| May 2026 | 747.8 thousand |
| Jun 2026 | 737.6 thousand |
| Jul 2026 | 720.9 thousand |
| Aug 2026 | 715.9 thousand |
| Sep 2026 | 727.9 thousand |
None of this means quotes are a waste. A written quote is how most catering gets sold. The point is to know what each one costs, so you can decide which minutes to keep and which to remove.
Time ten quotes, touch by touch
Guesses about your own time are unreliable, so measure it. For the next ten catering inquiries, whoever touches an inquiry writes the minutes on its row in the inquiry log. Count working minutes, not elapsed time, and split them into these touches.
Sort and read
Opening the inquiry, reading it and deciding what kind of job it is.
First reply
Writing the acknowledgment or the first email with questions.
Clarifying rounds
Each extra email, text or call to pin down the date, headcount, address or dietary needs.
The call
Scoping calls for staffed events, plus any phone tag before the call connects.
Kitchen and capacity check
Asking the chef about the date, the prep load and any rentals.
Writing the quote
Building the menu, prices, fees and terms into a document the buyer can approve.
Revisions and follow-ups
Changes the buyer asks for, and each follow-up until a yes or a no.
| Touch | Drop-off lunch for 40 (Example) | Staffed buffet for 120 (Example) |
|---|---|---|
| Sort and read | 3 min | 4 min |
| First reply | 5 min | 8 min |
| Clarifying rounds | 6 min (one round) | 14 min (two rounds) |
| The call | 0 min | 20 min, including phone tag |
| Kitchen and capacity check | 3 min | 15 min |
| Writing the quote | 10 min | 30 min |
| Revisions | 0 min | 15 min |
| Follow-ups | 4 min | 8 min |
| Total | 31 min | 114 min |
Elapsed time matters as well, in a different way. A staffed quote that takes 114 working minutes can take four days from inquiry to quote, because each clarifying round waits for a reply. Planners solicit bids from several venues and service providers as a routine part of the job[4], and every day your quote is missing from their inbox is a day the other bids sit there alone.
Turn minutes into cost per booked order
Price the minutes at what an hour actually costs you, not the wage alone. Food service managers earned a median $33.36 an hour in May 2025[2]. Across private industry, benefits made up 30.0% of employer compensation costs in June 2026[1]. Example: if benefits are the same share for your manager, the loaded cost is about $33.36 ÷ 0.70, or $47.66 an hour.
Source: US Bureau of Labor Statistics, 2026[1]
Show the data
| Item | Value |
|---|---|
| Private industry, all workers | $46.89 |
| Leisure and hospitality, full-time | $27.95 |
| Leisure and hospitality, part-time | $17.21 |
The rate depends on who does the work. Employer costs for full-time leisure and hospitality workers averaged $27.95 per hour worked in June 2026, against $46.89 across private industry[1]. If a host or a front-of-house lead handles the early touches, the blended rate drops. Hosts earned a median $15.00 an hour in May 2025[5], and event planners, a useful benchmark if you are weighing a catering sales hire, $29.41[6].
Then divide by the quote-to-order rate, because the quotes you lose are paid for by the orders you win.
| Step | Drop-off lunch for 40 (Example) | Staffed buffet for 120 (Example) |
|---|---|---|
| Working minutes per quote | 31 | 114 |
| Cost per quote at $47.66 an hour | $24.62 | $90.55 |
| Quote-to-order rate | 45% | 30% |
| Admin cost per booked order | $54.72 | $301.85 |
| Order value | $880 | $5,400 |
| Admin cost as a share of the order | 6.2% | 5.6% |
Example: the drop-off lunch costs less admin in dollars but slightly more as a share of the order, and drop-off orders are usually the ones a restaurant handles most often. That is where shaving minutes pays back fastest. A fixed drop-off menu with posted per-person prices can turn a 31-minute quote into a ten-minute confirmation, because there is nothing left to clarify or write.
Costs the touch log misses
The touch log captures working minutes. Four costs sit outside it, and together they are often bigger.
- Quotes handled during service. A manager who steps off the floor at 12:30 to call back a catering lead is not watching tickets, tables or the pass. The minutes are the same; the cost to the dining room is not.
- Errors from rushed quotes. A headcount copied wrong or a delivery fee left off comes out of margin when the invoice is corrected or the food runs short. Every clarifying round removed at intake is one less chance to copy a number wrong.
- Changes after booking. Headcount updates, menu swaps and new delivery times arrive after the quote is signed, often by phone, and each one repeats part of the quote work. Log them on the same row to see what an order costs after the yes.
- Quotes that arrive too late. A buyer who books someone else on day two never appears as a cost in the log, but the minutes already spent on that inquiry are gone.
Example: if one staffed event in four needs two post-booking changes of 15 minutes each, that adds about 7.5 minutes to the admin time of every staffed order. Small on its own, until the holiday season stacks twenty of those changes into the same three weeks.
Intake changes that cut the touches
Most of the minutes in the touch log are not writing; they are asking. The changes below go after the clarifying rounds, the phone tag and the blank-page quote.
- Capture the five facts at first contact: date and ready time, headcount, service style, location and dietary needs, asked the same way on the form, the host's catering card and the phone. Catering inquiry questions to ask every client has the wording.
- Publish per-person ranges and minimums on the catering page. Buyers who cannot afford you leave before inquiring, and the ones who stay arrive pre-qualified. How to price catering per person covers the numbers.
- Book the call by email. Offer two times and the number you will call from, instead of calling cold and trading voicemails.
- Quote from bundles. Three set menus per service style turn writing into assembly, and the catering quote template keeps the layout fixed.
- Keep a capacity calendar that the chef updates weekly, so the kitchen check is a glance instead of a conversation.
- Set follow-up dates on the row when the quote goes out, instead of reminders in someone's head.
Example: applied to the staffed buffet, capturing the five facts up front removes both clarifying rounds (14 minutes), booking the call removes most of the phone tag (8 of the 20 call minutes), the capacity calendar halves the kitchen check (7 minutes saved) and bundles cut writing from 30 minutes to 15. That is 44 minutes saved, taking the quote from 114 to 70 minutes before revisions change at all. Templated first replies and follow-ups take off roughly another nine, which brings the total close to half. The first-reply email templates cover that step.
Where the phone fits
- Caller
- SI Employee
- System
- Your team
01Caller
Call during lunch rush
Forwarded on overflow; caller gives date, guests, style, venue and diet.
02SI Employee
Intake captured
The five facts and a preferred callback time, in one summary.
03System
Summary to the manager
Emailed summary; recording and transcript in the call inbox.
04Your team
Scoping call at set time
Manager calls from the restaurant line in the window the caller chose.
05Your team
Quote from a bundle
Set menu, fees and terms; sent the same day, follow-up dates on the row.
Example flow. Menus and prices stay with the catering manager.
The clarifying round that costs the most is the one that starts on the phone: a host takes a name and number during service, and the manager starts from zero the next morning. If the catering line is forwarded on overflow or after hours to an SI Employee, it takes the event date, guest count, service style and callback details and emails the catering manager a summary, with the recording and transcript in the AssistCall inbox. Menus and prices stay with your team. What it does lists the rest, and the restaurant group catering example models the manager time it would take off a three-restaurant group.
What the intake time adds up to each month
To size the whole job rather than one quote, use the calculator. Count every catering call and inquiry that needs intake, the manager minutes each one takes, and the share of that intake that could be done before it reaches the manager.
| Input | Example |
|---|---|
| Catering calls and inquiries a day | 6 |
| Manager minutes on intake for each | 9 |
| Intake done before the manager (%) | 60% |
| Manager hourly wage | $33.36 |
| Calls a month | 130 |
| Staff hours on these calls | 20 |
| Hours handed off | 12 |
| Monthly value of that staff time | $391 |
How it is worked out: Calls a day × 21.7 working days × minutes per call ÷ 60 × share handled = hours; hours × hourly cost.
Assumptions
Example. Monthly hours = inquiries a day × 21.7 × minutes ÷ 60 × share handled; monthly cost = hours × hourly cost.
Example: about 12 manager hours a month, roughly $390 at the median wage before benefits. That is the intake alone. The larger effect is on speed: a quote that goes out the day of the inquiry, instead of three days later, competes with fewer bids.
When the hours justify a person
Run the touch log for a month and multiply it out. If quote work regularly takes more than a day a week of a manager's time, it is competing with the floor, the schedule and the P&L. Labor already takes roughly 33 cents of every sales dollar[7], so hours spent chasing headcounts are hours not spent on the dining room.
At that point there are three choices: cut touches with the changes above, move the early touches to people whose hours cost less, or hire for it. Catering sales manager pay and when to hire covers the last option, and a phone time audit shows how much of the day the phone takes across every kind of call. For how catering admin fits your wider labor numbers, see labor cost percentage for restaurants.
Frequently asked questions
How long should a catering quote take?
There is no standard. A routine drop-off quote can take ten minutes if menus and prices are fixed; a staffed event with rentals can take two hours of working time. Time your own ten quotes before setting a target.
What hourly rate should I use to cost quote time?
The loaded cost of whoever does the work: wage plus benefits and payroll costs. Across private industry, benefits were 30.0% of compensation costs in June 2026[1]. For a manager on the May 2025 median wage of $33.36[2], that is roughly $48 an hour.
Why divide by the close rate?
Because you spend time on every quote and recover it only on the ones that book. At a 30% quote-to-order rate, each booked order carries the time of more than three quotes.
How fast should a catering quote go out?
Same day for routine drop-off orders, and within one business day of the scoping call for staffed events. Planners collect bids from several providers[4], so a late quote competes at a disadvantage.
Which change saves the most time?
Capturing the five intake facts at first contact, on every channel. In the Example touch log it removes the clarifying rounds, the single biggest block of avoidable minutes.
References
US Bureau of Labor Statistics (2026). Employer Costs for Employee Compensation news release, June 2026 (released September 9, 2026) (opens in a new tab) ↑
US Bureau of Labor Statistics (2025). Occupational Outlook Handbook: Food Service Managers (opens in a new tab) ↑
US Bureau of Labor Statistics (2026). Current Employment Statistics: special food services employment (series CES7072230001) (opens in a new tab) ↑
US Bureau of Labor Statistics (2026). Occupational Outlook Handbook: Meeting, Convention, and Event Planners (opens in a new tab) ↑
US Bureau of Labor Statistics (2025). Occupational Employment and Wage Statistics, May 2025 national estimate: Hosts and hostesses median hourly wage (opens in a new tab) ↑
US Bureau of Labor Statistics (2025). Occupational Employment and Wage Statistics, May 2025 national estimate: Meeting, convention and event planners median hourly wage (opens in a new tab) ↑
National Restaurant Association (2026). Restaurants remain resilient despite challenging business conditions (opens in a new tab) ↑